Welcome,  
RMSA
  • Home
  • Entry
    • Budget Outlay
    • Expenditure
    • New Schools
      • Construction Status of New School
      • Functional Status of New Schools
    • Strengthening
      • Elementory/Secondary
      • Higher Secondory
    • Reimbursment 12(1)c
      • Reimbursment 12(1)c School
      • Reimbursment 12(1)c Student
    • ICT
      • School
      • BRC
    • Others
      • BRC Repair
      • Minor Repair
      • Furniture
      • BoundryWall
      • Handwash
      • Major Repair
      • Ramp & Handrails
      • Electrification
      • Tablet
      • Solar
      • Water
      • Incinirator
      • Dilapidated Status
      • Smart-classroom Status
      • Rain Water Harvesting Status
      • Kitchen Garden Status
      • Pre-Primary School Status
      • Dysfunctional Toilet
      • Toilet Status
        • General
        • CWSN
    • Residential
      • Teacher Quarter
      • NSAV Hostel
        • Residential Hostel
        • Residential Hostel Construction
      • NSAV School
        • Residential School
        • Residential School Construction
    • KGBV
      • Functional Status
      • Construction Status
    • VE
      • Functional Status
      • VOE Spoke Status
    • CWSN
      • Girls
        • Student Entry
        • Incentive
      • Boys
        • Student Entry
        • Incentive
  • Reports
    • Approved Outlay
      • Year wise
      • Matrix
    • Expenditure
      • Recurring
      • Non-Recurring
    • Reimbursement of 12(1)(C)
      • Reimbursement
      • List of Private Schools
    • New Schools
      • Construction Status of New Schools
      • Functional Status of New Schools
    • Strengthening
      • Approvals
        • Cummulative
          • Elementary
          • Secondary
        • Year-Wise
          • Elementary
          • Secondary
      • Others
        • Tablet
        • Toilet
        • BRC Repair Status
        • Incinerator / Vending Status
          • Year Wise
          • Cummulative
      • Progress
        • Cummulative
          • Elementary
          • Secondary
        • Year-Wise
          • Elementary
          • Secondary
        • Financial Year-wise
    • ICT
    • KGBV/NSAV
      • KGBV
        • Summary
        • Detailed Status
        • Constrction Status
      • NSAV (Residential)
        • Hostel
        • School
    • Vocational Education
      • Functional Status of Vocational Education
      • Functional Status of VOE SPOKE
    • CWSN
      • Girls
        • Detailed
        • Block wise
      • Boys
        • Detailed
        • Block wise
    • Cancellations List
    • Pre Primary
  • AWP & B
    • E-costing
    • OOSC
      • Verification
        • Student
          • Elementary (Below 14 Yrs)
          • Secondary (Above 14 Yrs)
          • Migrant Children
          • Proposal for Continued Children
        • STC Mapping with Students
          • OoSC Children
          • Migrant Children
        • Main Stream with Students
          • For OoSC
          • For Continue Student
        • School Children through Direct Enrollment
        • Direct Enrollment Through NIOS
      • Report
        • Verification Status
          • For OoSC
          • For Continue
        • Student Status
          • Elementary(Below 14 Yrs)
            • With Verified
            • Without Verified
            • WCD Girls
          • Secondary(Above 14 Yrs)
          • Migrant Children
          • Discrepancies
          • Continue Proposal Mapping Students with STC
        • Special Training Center
          • STC Status
            • For OoSC
            • For Migrant Children
          • STC Opening/closing Status
        • Mapping Students with STC
        • Student Attendance
          • For OoSC
          • For Continue Student
        • Mainstream Through STC
        • School Children through Direct Enrollment
        • Direct Enrollment Through NIOS
    • Freez Proposal
    • Reports
      • List of Acivities
        • Detailed
      • Proposal
        • Detailed
        • Intigrated
    • Perspective Plan
      • Perspective E-costing
      • Freez perspective Proposal
    • Shift Proposal
      • Report
        • Detailed
        • Intigrated
  • Profile
    • District Profile
    • Reset School Profile
    • Reset Block Profile
  • Freeze
    • Expenditure
    • New School
      • Functional
      • Construction
    • Others
      • Ramp & Handrails Progress
      • Residential School
      • Residential Hostel
      • Resedential Quarter
      • Major Repair
      • Electricity
      • Solar
      • Incinirator
      • Pre-Primary
      • Furniture
      • Handwash
      • Smart Class
      • Rainwater Harvesting
      • kitchen Garden
    • Strengthening
      • Elementory/Secondary
      • Higher Secondary
    • ICT
    • Water Progress
    • Toilet
      • Toilet Progress
      • Dysfunctional Toilet
    • VE
      • Functional
  • Logout
  • Downloads
    • Document
    • User Manual of Uploading OOSC Data
    • Appraisal / Minutes
    • Training Videos
  • Teacher Education
    • Equipment
    • Strengthning
    • Diet
    • ICT Diet
  • Help
    • Contact us
    • FAQ
  • Gallery
    • National Gallery
    • Report Status
Copyright @ Integrated Scheme For School Education , All right reserved 2014
Designed and Developed by TSG-Samagra Shiksha